Skip to content

Trade show · Food industry

Your stand at CFIA Rennes.

The meeting place for suppliers to the food industry: ingredients, equipment and processes, packaging, facing food manufacturers from western France and beyond. A supplier show, technical and dense: machines and product ranges are presented, meetings are booked. The stand must show the product and make conversation possible.

  • 9–11 March 2027Next edition
  • Rennes Exhibition CentreRennes
  • 48 hoursModular pack quote
  • from 9 m²Your stand

Budget

How much does a stand at CFIA Rennes cost?

With a modular pack — our reusable technical base, from 9 to 24 m² — our per-square-metre prices apply in Paris and the Paris region; elsewhere, contact us: the quote is still all-inclusive and arrives within 48 working hours. For bespoke joinery, every stand is individually quoted, with the quote delivered within 14 working days.

Ask usModular packs · 9 to 24 m², outside the Paris region
Contact usBespoke joinery · price on request

Stand size

What size, what format

For a modular pack, from 9 to 24 m², our per-square-metre prices apply in Paris and the Paris region: for Rennes, the price is on request, with a single point of contact from quote to dismantling. For bespoke joinery, our design office creates the stand, sketch then 3D, and sends you a quote within 14 working days.

  • Venue: Rennes Exhibition Centre
  • City: Rennes
  • Frequency: Every year, in the spring

The reverse schedule

Ready on opening day

  1. 6 months before

    A spring show is prepared in autumn: book your stand space and ask us for the price of your stand, on request for a show elsewhere in France.

  2. 3 months before

    Product range or machine to exhibit decided, design approved: pack quote within 48 working hours, joinery costing within 14 working days.

  3. 2 months before

    Technical file submitted to the organiser, loads and power supplies declared: approval is included.

  4. Show day

    Installation by our local teams, cleaning the day before opening, a technician in under 2 hours during the trade show.

Points to watch

Getting your stand approved by the organiser is included in our service: you do not need to open the regulations, we know them.

  • A machine or production line on demonstration: electricity, water and floor loads are declared in the technical file and ordered from the venue before installation
  • A show elsewhere in France changes nothing about the service: a single point of contact, the same lead times and the same checks as in Paris; only the pack price is on request
  • Food manufacturers look at their suppliers’ CSR: reuse of structures, stackable furniture, low-energy LEDs; a CSR labelling process begun in September 2026, with an audit to come

Frequently asked questions

CFIA Rennes: the practicalities

How much does a stand at CFIA Rennes cost?

For a show elsewhere in France, such as CFIA Rennes, the price of modular packs, from 9 to 24 m², is on request: our per-square-metre prices apply in Paris and the Paris region. For bespoke joinery, every stand is individually quoted. Either way, get in touch.

When should you start a stand project for CFIA?

Six months before opening, in the autumn. The pack quote arrives within 48 working hours and the joinery costing within 14 working days; your space, however, needs to be booked early.

Do you work in Rennes?

Yes. Modular packs are delivered, installed and dismantled anywhere in France, with a single point of contact from quote to dismantling; outside the Paris region, their price is on request. For bespoke joinery, every stand is individually quoted.

Your project

Your stand at CFIA Rennes
starts here.

All the trade shows we cover: the trade show index, and our service areas.